A complete reverse-osmosis machine — not a filter cabinet. Raw-water intake, pretreatment, high-pressure pumping, 8040 membrane array, permeate and reject headers, CIP, chemical dosing and a protection panel. Nameplate is continuous gallons per day at the design temperature and recovery. If the well is still brackish (typically a few hundred to about 5,000–8,000 mg/L TDS) this is the package. Above that band the same mechanical layout moves onto seawater membranes (see SWRO).
Utility and oilfield camps (Habshan / Buhasa / Al Khazna / Khan Sahib / Al Jumma class), factories, and any site where tanker or municipal water is too expensive. Product usually feeds a camp tank and then a ring main. Reject can go to dust suppression, toilets or drain — never back to the well without a written scheme.
Raw tank or flooded suction → feed pump (duty calculated; 4–6 HP class is common on mid plants) → multimedia / FRP 4272 where solids or colour require it → jumbo or cluster cartridge (20″, 5 µm then 1 µm) → antiscalant dosing and acid dosing if LSI / pH demand it → high-pressure pump → pressure vessels (typically 5-element 600 psi FRP; 4 vessels on a 100,000 GPD / 20-element array) → permeate to product tank → reject to drain or further use. CIP tank and pump sit on the same skid or in the container aisle. Flush to permeate on shutdown where specified.
| Membranes | BW 8040 high-rejection, 20 nos. (count follows flux and recovery) |
|---|---|
| Vessels | 5-element, 600 psi FRP, 4 nos. typical |
| High-pressure pump | One duty pump, specified on m³/h and bar — brand named only when the LPO requires it |
| Feed pump | Matched to cartridge ΔP and suction condition |
| Frame & pipe | SS304 skid and SS fittings lot; PVC-U lot on low pressure |
| Pre-filtration | Jumbo 20″ cluster, 8-housing class where written |
| Controls | Contactor / relay panel, dry-run stop, empty-tank stop; PLC + HMI only if ordered |
| Dosing | Antiscalant + acid tanks and Italian-class diaphragm pumps |
| CIP | FRP or PE tank, pump, valves — omitted only when the LPO deletes it |
| Package | 20 ft economy or 40 ft HC container, lighting, cable tray |
| Instruments | Pressure gauges, flow meters (Italy-class when specified), product conductivity / TDS |
Design from the analysis, fabrication, FAT at workshop where agreed, delivery to UAE site, mechanical installation of the package, electrical termination to the client isolator, commissioning, performance log (feed / product TDS, flows, pressures), O&M handover.
Civil tanks and foundations, incoming power beyond the isolator, raw and product tank supply, interconnecting yard piping outside the skid battery limit, chemicals for first fill if not listed, membranes / seals / motors later called “out of scope” on AMC.
Ion analysis (TDS, hardness, iron, silica, pH, temperature as a minimum), required GPD at 24 h or at shift hours, power available (415 V / 3 ph typical), product destination (tank or ring), container vs open skid, and who owns civil tanks.
Lump-sum supply + installation + commissioning. Payment has been written as 75% advance, as 90/10, and as 25% / 50% on delivery / 25% on commissioning. VAT 5% extra. Warranty 12 months from commissioning on plant components; cartridges and chemicals excluded. Emergency attendance is AMC, not warranty.
| Parameter | Typical |
|---|---|
| Capacity / flow | Typical 10 to 500 m³/day |
| Feed water | Brackish well water or municipal water |
| Operating pressure | Typical 10 to 20 bar |
| Recovery | Typical 60 to 75% |
| Salt rejection | Typical 98 to 99.5% |
| Materials | SS316 high-pressure piping, uPVC low-pressure piping, FRP vessels |
| Power | 380-415V / 3ph / 50Hz |
| Footprint | Typical 3 x 1.5 m to 8 x 2.5 m skid |
| Controls / instrumentation | PLC with HMI, conductivity, pressure and flow, dosing control |
Typical values. Final specifications depend on feed water analysis and site requirements.
Plants are sized to your demand from the well analysis.
Containerized plants can be moved with the camp.
We check the design margin; high TDS may need seawater membranes.