A complete reverse-osmosis machine — not a filter cabinet. Raw-water intake, pretreatment, high-pressure pumping, 8040 membrane array, permeate and reject headers, CIP, chemical dosing and a protection panel. Nameplate is continuous gallons per day at the design temperature and recovery. If the well is still brackish (typically a few hundred to about 5,000–8,000 mg/L TDS) this is the package. Above that band the same mechanical layout moves onto seawater membranes (see SWRO).
Utility and oilfield camps (Habshan / Buhasa / Al Khazna / Khan Sahib / Al Jumma class), factories, and any site where tanker or municipal water is too expensive. Product usually feeds a camp tank and then a ring main. Reject can go to dust suppression, toilets or drain — never back to the well without a written scheme.
Raw tank or flooded suction → feed pump (duty calculated; 4–6 HP class is common on mid plants) → multimedia / FRP 4272 where solids or colour require it → jumbo or cluster cartridge (20″, 5 µm then 1 µm) → antiscalant dosing and acid dosing if LSI / pH demand it → high-pressure pump → pressure vessels (typically 5-element 600 psi FRP; 4 vessels on a 100,000 GPD / 20-element array) → permeate to product tank → reject to drain or further use. CIP tank and pump sit on the same skid or in the container aisle. Flush to permeate on shutdown where specified.
| Membranes | BW 8040 high-rejection, 20 nos. (count follows flux and recovery) |
|---|---|
| Vessels | 5-element, 600 psi FRP, 4 nos. typical |
| High-pressure pump | One duty pump, specified on m³/h and bar — brand named only when the LPO requires it |
| Feed pump | Matched to cartridge ΔP and suction condition |
| Frame & pipe | SS304 skid and SS fittings lot; PVC-U lot on low pressure |
| Pre-filtration | Jumbo 20″ cluster, 8-housing class where written |
| Controls | Contactor / relay panel, dry-run stop, empty-tank stop; PLC + HMI only if ordered |
| Dosing | Antiscalant + acid tanks and Italian-class diaphragm pumps |
| CIP | FRP or PE tank, pump, valves — omitted only when the LPO deletes it |
| Package | 20 ft economy or 40 ft HC container, lighting, cable tray |
| Instruments | Pressure gauges, flow meters (Italy-class when specified), product conductivity / TDS |
Design from the analysis, fabrication, FAT at workshop where agreed, delivery to UAE site, mechanical installation of the package, electrical termination to the client isolator, commissioning, performance log (feed / product TDS, flows, pressures), O&M handover.
Civil tanks and foundations, incoming power beyond the isolator, raw and product tank supply, interconnecting yard piping outside the skid battery limit, chemicals for first fill if not listed, membranes / seals / motors later called “out of scope” on AMC.
Ion analysis (TDS, hardness, iron, silica, pH, temperature as a minimum), required GPD at 24 h or at shift hours, power available (415 V / 3 ph typical), product destination (tank or ring), container vs open skid, and who owns civil tanks.
Lump-sum supply + installation + commissioning. Payment has been written as 75% advance, as 90/10, and as 25% / 50% on delivery / 25% on commissioning. VAT 5% extra. Warranty 12 months from commissioning on plant components; cartridges and chemicals excluded. Emergency attendance is AMC, not warranty.