Recover about 70% of grey / sewer / laundry drain as clear water for final rinse, flushing or irrigation as the client writes. Not a licence to put recycled water on drinking taps.
Fine screen / lint → equalisation → anoxic/aerobic biology as designed → submerged MBR cassette → permeate tank → chlorine or UV → optional RO if TDS or colour still fails the rinse spec → distribution to the locked reuse header. Surplus and sludge to the existing drain / tanker.
Daily m³ of drain, peak hour, temperature, whether kitchen is on the same line, existing pit volume, reuse points (rinse / flush / landscape), and the utility’s reuse rules for that emirate.
Process design, MBR skid, cassette, blowers as BOQ, permeate pump, disinfection as BOQ, control panel, commissioning and recovery log (in vs product flow).
Civil pits, building drain reroute, tanker sludge contract, potable conversion (needs extra RO + UV + approvals).