Irrigation and livestock water from saline wells. Product TDS is a farm decision (often a few hundred mg/L), not “zero”. Recovery is held safe for gypsum and silica. Reject may be blended on salt-tolerant rows only if the agronomist agrees.
Same mechanical language as camp RO, usually open skid or shade, not always a container. Feed from the well or a raw pond. Multimedia if the well sands. SW membranes if TDS is in the seawater band (Ajban-class 11,700 mg/L with 15 × 8040 on three 5-element vessels is a restoration case, not a BW design).
Measure actual GPD vs nameplate, feed and product TDS, vessel count, membrane type, gauges and the built-in TDS meter. Typical findings: meter dead, BW elements on SW-range feed, end-caps or seals failed, production 40–50% of plate. Quotation then splits: (1) restore nameplate with SW 8040 set + meter, (2) optional extra vessel + elements if the client wants 100,000 GPD from a 75,000 GPD frame.
Well analysis, hectares or livestock head, hours of pumping, existing plant photos / vessel count, power.
We also restore existing plants that have fallen below nameplate.
We measure output and condition and quote restoration.
Set with your agronomist for the crop.
Sometimes with extra vessels, after checking the frame and pump.